EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
SpiritOfMudsuck
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (686)
Avionics
- (33)
-
Drill Subpanel for...
-
Drill Video Subpanel...
-
Panel wire review
-
Panel changes and...
-
Wiring Cleanup and Prep
-
Panel Wiring
-
iEFIS page collection
-
Solder pins to...
-
Checkout Tosten CS-8...
-
Video cabling
-
Wiring for cameras
-
MGL GPS Mount Layout
-
Rewire Avionics...
-
Update MGL Firmware
-
Wiring VHF Com Radio
-
Building screens for...
-
Add ECB CAN bus
-
Working with ECB
-
EFIS wiring
-
Sort & label...
-
System Test Failure
-
Screen Design
-
Connect Instrument...
-
Install Instrument...
-
Material for...
-
Screen Programming
-
Customize Screen Design
-
iEFIS mockup -...
-
iEFIS Mockup Mount
-
Load iEFIS with...
-
Avionics Mockup
-
Setup EFIS SD Card
Cockpit
- (33)
-
Review XNB-F06
-
Reinstall Controls
-
Prep for primer
-
Finish Spoiler...
-
Glare shield to...
-
Rudder and brake bolts
-
Paint Instrument Panel
-
Begin Tank Vent...
-
Spoiler Pulley Mount...
-
Glare Shield Prep
-
Begin Tank Vent...
-
Pilot Side Seat Pan...
-
Spar Tunnel, Seat...
-
Seat back Install
-
Determine Seat Pan...
-
Cut Seat Pan
-
Install Seat Belt...
-
Installation of...
-
Cockpit Vent
-
Install Port side...
-
Locate Hydraulic...
-
Pilot Seat Belt,...
-
Drill Landing Gear...
-
Up-drill Windscreen...
-
Test Fit Windshield
-
Fit Canopy Skirt,...
-
Nutplates, Secure...
-
Install Nutplates on...
-
Fit interior ABS panels
-
Pulley Cable through...
-
Winshield Bow Rivets
-
Seat Back Top Hinge,...
-
Fuel Tank Stop
Controls
- (69)
-
XNS-C06-08 Spoiler...
-
Control stick...
-
Control stick...
-
Machine control...
-
Spoiler pulley...
-
Spoiler pulley...
-
Spoiler pulley...
-
Dimple spoiler...
-
Spoiler control
-
Spoiler controls
-
Pin rudder and brakes
-
XNB-C01: Mixer...
-
Install rudder hinge...
-
Mount Throttle
-
Throttle Control...
-
Connect Port...
-
Installed trim...
-
Check Quick-release...
-
Cut Quick-release...
-
Horizontal Trim...
-
Aileron Quick...
-
Make Trim Spring...
-
Additional Rudder...
-
Trim Rudder Pedal...
-
Fit Starboard Seat...
-
Rudder Pedal Springs
-
Install Mixer...
-
Prep Rudder Drive
-
Clean and Prime...
-
Reverse Pulleys,...
-
Repair Mixer Drive
-
Rudder springs
-
Idler to Mixer...
-
Fit Rudder Springs
-
Spoiler Pulley Gusset
-
Control Stick Taper Pin
-
Spoiler Drive...
-
Spoiler Drive...
-
Spoiler Drive...
-
Fit Fuselage Spoiler...
-
Spoiler Handle Pivot...
-
Attach Rudder Controls
-
Spoiler Cable...
-
Control Stick Horn...
-
Control Pulley...
-
Pulley Brackets,...
-
Spoiler Pulley Makeup
-
Control Fixtures,...
-
Rough Cut Control...
-
Rear Rudder Cables
-
Rudder Controls
-
Control System Parts
-
Mixer Mount
-
Mark Fairlead Blocks...
-
Drill Fairlead Blocks
-
Ream Control Stick...
-
Drill Mixer Output Arm
-
Pickup Mixer Assembly
-
Rudder Pedal Fit
-
Mixer Pivot Bearing...
-
Control Cable Adjusters
-
Second Rudder Block
-
Pulley Bracket Assembly
-
Finish First Rudder...
-
Layout, Cut Rudder...
-
Spoiler Handle
-
Add Snap Bushings to...
-
Drill & Fit...
-
Controls and Gear Kit
Cowling
- (29)
-
Top cowling alignment
-
Paint top cowling
-
Paint interior lower...
-
Fit cowling
-
Additional inlet...
-
Remove FAILED JB...
-
Epoxy cowl vents to...
-
Fair Fiberglass...
-
Trim Upper Cowling
-
Locate cowling...
-
Sand Cowling Vent Shape
-
Attach Cowling Vents...
-
Sand and Attach Vent...
-
Fit port side scoops
-
Change Vent Location...
-
Initial Vent Layout,...
-
Prep for Cowling...
-
Cowlng Vent Layout
-
Bottom Cowling...
-
Removed bottom hinge
-
Bottom Attachment...
-
Bottom Attachment Hinge
-
Cowling...
-
Trim Cowling
-
Trim and Trial fit...
-
Cleco Hinges to Cowling
-
Alignment, XNB-P11
-
Test Fit Cowling...
-
Initial Purchase
Documents
- (5)
-
MGL iEFIS...
-
MGL iEFIS Explorer Docs
-
AeroVee 2.1 Turbo
-
Unload &...
-
N-number Reservation
Empennage
- (105)
-
Check dust cover fit
-
XNB-T03: Finish...
-
RG-58 to BNC for ELT...
-
Nutplates for...
-
Tail fairing fasteners
-
Make XNB-T01-02 fairing
-
XNB-T01-02 Fairing
-
Align starboard...
-
Port side...
-
Ruddervator pushrod...
-
Replace Rudder Hinge
-
Starboard tail tip...
-
Replace Rudder Hinge
-
Replace Rudder Hinge
-
XNB-T03: Finish...
-
XNB-T02: Set...
-
XNB-T03: Rivet...
-
XNB-T02: Starboard...
-
XNB-T04: Install...
-
XNB-T04: Align and...
-
XNB-T03: Port...
-
XNB-T03: Port...
-
XNB-T04: Port Side...
-
Rivet Starboard Y...
-
Close Port...
-
Rivet Port Y to...
-
XNB-T01: Install...
-
Fit Tailcone Fasteners
-
Torque Forward...
-
Align and Bolt...
-
XNB-T02: Prep...
-
XNB-F21: Complete...
-
XNB-T02: Fit...
-
XNB-T02: Fit...
-
XNB-T05: Cut and...
-
XNB-T02: Test Fit...
-
XNB-F21: Inspect...
-
NB-T02: Port...
-
XNB-F21: Forward...
-
XNB-F23: Bolt Y...
-
XNB-F23: Bolt Y...
-
XNB-F21: Tailwheel...
-
XNB-T04: Prep...
-
Dimple Forward Spar...
-
Updrill and Deburr...
-
Fit and Drill Right...
-
XNB-T04: Align and...
-
Updrill/Deburr Stbd...
-
Align Stabilator Skin
-
Deburr Y Fitting
-
XNB-T04: Fit Right...
-
Deburr Y...
-
Up-drill Y fitting...
-
XNB-F: Mount Y...
-
XNB-T05: Complete...
-
XNB-T05: Prep...
-
XNB-T06: Remake...
-
XNB-T05: Right...
-
XNB-F22-05R/L:...
-
XNB-F25: Inspection...
-
XNB-F23: Rudder...
-
Fit Tail Cone Parts
-
XNB-T05: Stabilator...
-
XNB-T05: Up-drill...
-
XNB-T04: Pilot...
-
XNB-F22: Tail...
-
XNB-T06: Stabilator...
-
Trial Fit Y-Stack
-
Up-drill Y Fittings
-
Trial Fit and Mark...
-
Tail Post Test Fitting
-
Remake Tail Tab Mounts
-
Remake Upper and...
-
Test Fit Y to Fuselage
-
Fitting Tailpost
-
Fit Y Attachment
-
Y Tail Mounting Tabs
-
Skin Left Stabilator
-
Rudder Layout &...
-
Prep Stabilator Skin
-
Rudder Cut and Prep
-
Rivet Port...
-
Prep Left Stabilator...
-
Fit Left Stabilator...
-
Stabilator Forward...
-
Layout Stabilator...
-
Layout Stabilator...
-
Rivet Ruddervators
-
Ruddervators, drill...
-
Drill and Deburr Y...
-
XNB-T07 Ruddervators
-
Port Ruddervator...
-
Starboard Ruddervator
-
Updrill Ruddervator...
-
Drill Ruddervator...
-
Drill Ruddervator...
-
Bend Stabilator Tabs
-
Mark Stabilator Ribs...
-
Deburr & Prep...
-
ST-1 Probe Mounts,...
-
Stabilator Ribs,...
-
Study Tail Kit...
-
Part Construction...
-
Stabilator Parts...
-
Tail Kit Purchase
Engine
- (78)
-
Clamps for Secondary...
-
Mixture Control Arm...
-
Mixture Control Cable
-
Mixture Control Cable
-
Makeup new oil lines
-
Attach Oil pressure...
-
Turbo cooling plumbing
-
EGT sensors
-
Low oil level mark
-
Turbo Exhaust Flange
-
Secure oil lines
-
Install turbo oil...
-
CHT & oil...
-
Attach oil cooler...
-
Oil Cooler Baffling
-
Cutout cooling air...
-
Turbo Radiator...
-
Remove Center...
-
Port rear baffle fitup
-
Fit Turbocharger Intake
-
Port Side Baffle...
-
Reinforce oil filter...
-
Turbocharger Mounting
-
Turbo Radiator/Plenum
-
Mount/Plenum for...
-
Set Cooling Lines...
-
Set Nutplates on...
-
Master...
-
Waste Gate Actuator...
-
Turbocharger Fitup
-
Research alternate...
-
Starboard Cylinder...
-
Cooling Pump Test
-
Aft oil line clamp
-
Remove Turbo, Tap...
-
Oil return line from...
-
Turbo Shroud
-
Secure Oil Lines
-
Install Port CHT...
-
Plenum for Turbo...
-
Oil Vapor Vent Line
-
Install AN4 oil lines
-
Turbo/Intake/Starter...
-
Turbo Cooling...
-
Install oil pressure...
-
Tubocharger Fit
-
Manifold Alignment
-
Install bulkhead to...
-
Spark plug passthrough
-
Cooling Baffle
-
Secure Port Side Baffle
-
Baffle Support
-
Mark Dip Stick
-
Cooling Baffle Fitup
-
Initial Fence Baffle...
-
Secondary Ignition...
-
Oil Return Line
-
Turbocharger Mount
-
Drill & Tap Oil...
-
Check Upper Turbo...
-
Mount Exhaust Manifold
-
Engine Mounting,...
-
Bolt Engine Mount to...
-
Install Time-Serts,...
-
Install Port Head...
-
Push-rod Assembly
-
Assembly
-
Determine Cylider...
-
Trim cylinder head...
-
Evaluate & Dress...
-
Setup Compression Ratio
-
Assembly, Torque...
-
Case Prep &...
-
Crankshaft &...
-
Case prep
-
Cam and Crank Assembly
-
Pickup AeroVee Kit
-
AeroVee 2.1 Turbo...
Ext. Finish
- (34)
-
Fill and Sand Wheel...
-
Port Wing - Finishing
-
Paint Port Wing Top
-
Port wing prep, top
-
Paint Port Wing Bottom
-
Port wing prep
-
Test Spray Equpment
-
Prep Spray Equipment
-
Starboard Aileron
-
Hang & Cover
-
Prime Small Parts
-
More sanding fairing...
-
Last of the Optiflow...
-
Fill and sand
-
Sand Fuselage
-
Prep and Prime Fuselage
-
Roll Primer on Fuselage
-
Sand Wing Tip and...
-
Prep and Prime...
-
Sanded filler on...
-
Sanding fairing filler
-
Fairing Empennage
-
Paint rack
-
Sanding fairing filler
-
Prep for additional...
-
Touch up primer on...
-
Epoxy primer...
-
Wings in cradle
-
Second coat port...
-
Clean, prep, prime
-
Clean, prep, prime
-
Clean, prep, prime
-
Clean, prep, prime
-
Hang wings for...
Firewall Forward
- (14)
-
Install wiring...
-
Wiring
-
Organize FWF wiring
-
Extend Thermocouple...
-
Engine wiring
-
Revamp FW Wiring Runs
-
FW Terminal Strip Mount
-
Backing Plate for...
-
Rivet Glare-shield...
-
Remove Glare-shield...
-
Remove rivets from...
-
XNS-P10: Engine Baffle
-
XNB-P14: Prepare...
-
XNB-P14: Install...
Fuel System
- (6)
-
Fuel tank fitup
-
FW to AI Fuel...
-
Fuel Tank Pressure Test
-
Fuel Tank outlet,...
-
XNB-G01: Fuel Tank...
-
XNB-B01: Fuel Tank
Fuselage
- (14)
-
Replace rivet under...
-
Remove rivets from...
-
Tail fairing
-
Replace Rudder Hinge
-
XNB-D04: Rudder...
-
XNB-D04: Place...
-
XNB-C05: Fit...
-
Enlarge rudder cable...
-
XNB-F21: Inspection...
-
XNB-F29: Rivet...
-
Close Box
-
Close Inspection...
-
Receive Quick Build
-
Initial Purchase
Hangar
- (106)
-
Rent
-
Rent
-
Rent
-
Rent
-
Rent
-
Organize & Prep
-
Raw material hangers
-
Hang Lights
-
Rent
-
Rent
-
Air Compressor
-
Rent
-
Rent
-
Move Workbench
-
Organize Space
-
Pickup and Deliver...
-
Level Flooring
-
Spread rock floor
-
Add stone to floor
-
Remove Impediments
-
Monthly rent
-
Evaluate and Clean...
-
Monthly rent
-
Monthly rent
-
Prep cradle for...
-
Packing and prep for...
-
Additional work on...
-
Wing Cradle Inspection
-
Clean and Collect
-
More platform recovery
-
Lumber recycle
-
Disassemble last of...
-
Recover 2x6s
-
Packing up
-
Prep for Move
-
Clean and Pack
-
More organization...
-
Organize and store...
-
Pack and Move Parts
-
Clean Up, Organize,...
-
Cleanup prep for Paint
-
Yearly Hangar Rental
-
Reorganize Storage
-
Hangar Cleanup
-
Refuse disposal
-
Hangar rent Sep 2020...
-
Repair Canvas Tear
-
Repair Roof Leak
-
Tighten/replace...
-
Cleanup
-
Repair Door...
-
Drainage
-
Additional Work Light
-
Set Drain Line
-
Placed drainage pipe
-
Clear Drainage
-
Replace Canvas Door...
-
Repair Torn Grommets
-
Divert Rain Water...
-
Paint and Hang Sign
-
Layout Hangar Sign
-
Front Wall Sign/rent
-
Drainage Ditch
-
Illuminated Exit Sign
-
Seal Roof
-
Chemical Weeding
-
Brush Cutting
-
Door Maintenance
-
Door Repair, APRS
-
Door Repair
-
Sliding Hangar Door
-
Roof Maintenance
-
Drainage and...
-
Hang Shop Lights
-
Install Shop Lights
-
Wire Outlets, Hang...
-
Power Conduit
-
Platform,...
-
Canvas Door Hangers
-
Work Platform...
-
Prep for Work...
-
Door Lockset &...
-
Install Entry Door
-
Entry Door Framing
-
Soft Door Hanger
-
Side Door Prep
-
Hang Right Side Door
-
Canvas Door...
-
Right-side Hangar Door
-
Wiring & Curtain...
-
Interior Conduit...
-
Prep For Hagar Door...
-
Prep for AEP Power...
-
Electrical...
-
Electrical...
-
Electrical Inspection
-
Grounding, Place Outlet
-
Pull Service Wires...
-
Underlayment and...
-
Rehabilitate Roofing
-
Strip Metal Sheeting...
-
Electrical Power...
-
Electrical Power...
-
Build work platform
-
Clean hanger space
-
Evaluation &...
Interior Finish
- (6)
-
Prep Cowl, wheel pants
-
Forward Cockpit...
-
Epoxy Primer
-
Primer Coat to...
-
Prep for Primer
-
Lightening Hole Plugs
Instrument Panel
- (72)
-
Switch wiring
-
Wire cleanup, RS232...
-
Wiring List
-
Switch hole plugs
-
Panel paint
-
Additional iEFIS...
-
MGL EFIS Screen...
-
Update EFIS Screens
-
MGL ECB #5-8 Breakers
-
Splice Tee in Pitot...
-
Install Analog ASI
-
SP-12 GPS Checkout
-
Prep Panel Underside
-
Radio and GPS...
-
Attach Com Mounting...
-
Rivet Piano Hinge to...
-
Layout for SP-12...
-
Mount for MGL SP-12...
-
Additional Panel...
-
Wire for OAT and Aux...
-
Reinstall Com Radio
-
Prep panels for paint
-
Wire Runs
-
ELT mount in panel
-
Final Design Choise
-
Final Designs
-
Update XPanel 5000...
-
Install Isolated...
-
Wiring for EFIS power
-
Cut and Shape Cover...
-
Cut Double D Holes
-
Drill holes For...
-
Switch Layout
-
Instrument Air Lines
-
Punch Out for Radio...
-
Punch Out Hole for...
-
Wiring ID and Power...
-
Sort Through...
-
Install Trim Control
-
Install Nutplates...
-
Mount Power Conditioner
-
Setup Panel...
-
Panel Layout
-
Nutplates for Radio...
-
Additional Panel Design
-
Fit Fuse Panel
-
Sub-panel Support
-
Cut Replacement Left...
-
Sub-panel Braces
-
Countersink and...
-
Panel Attachment
-
Cut Port side Panel
-
Layout and Install...
-
Accumulated Design Time
-
Test Fit Instrument...
-
Drill sub-panel...
-
Sub-panel Angle Bracket
-
Rivet and Space...
-
Instrument Sub-panel
-
Kitbashing Van's Mapbox
-
Bend Mapbox Tabs
-
Modify Mapbox
-
Wiring to Tail
-
Panel Layout...
-
Panel layout...
-
Instrument Sub Panel...
-
More XPanel Designs
-
Locate Airspeed...
-
Assemble/plan map box
-
Stabilator Ribs,...
-
Stabilator Rib Tabs
-
Initial Panel Layouts
Inspection
- (2)
-
Detailed Inventory
-
Unpack and Cursory...
Landing Gear
- (6)
-
Pack wheel bearings...
-
Prep Wheels
-
Flyboys tailwheel...
-
Tailwheel post rework
-
Check Wheel Track
-
Initial Purchase
Propeller
Radios
- (8)
-
Solder ELT DIN...
-
ELT wiring
-
Integrate MGL V16 Radio
-
Mount Radio and AHRS
-
Mount ELT
-
Explore various ELT...
-
Mounting tabs for...
-
Antenna Cable...
Research
- (21)
-
Plan Review
-
Sonex Corrects...
-
Email to Factory...
-
Update EFIS Checklists
-
MGL iEFIS Programming
-
Research Dzus...
-
SonexFlight Firewall...
-
XNB-G05: Determine...
-
Hardware Spreadsheet
-
Ground Instruction...
-
Review Plan Set
-
EAA Sheetmetal Class
-
Variometer Research
-
Antenna Research
-
Dwg XNS-T06:...
-
Polish Test
-
Study Tail Kit...
-
Self-launch endorsment
-
Experiential Flight...
-
Required tools,...
-
Full Kit Discount
Tools
- (11)
-
Repair Wheelbarrow
-
Complete Workbench #2
-
Construct EAA Std...
-
Prep for Quik-Build Kit
-
Cradle Assembly,...
-
Redesign and...
-
Cradle Base Assembly
-
Cut Cradle...
-
Wing Cradle Assembly
-
Wing Cradle Frame...
-
Wing cradle idea
Wings
- (34)
-
Prepare Wings for...
-
Main aileron pushrod...
-
Complete Rework of...
-
Rework Port Aileron...
-
Missing rivet
-
Rodent cover
-
Filler prior to sanding
-
Open rear spar...
-
Aileron fairings
-
Aileron Pushrod...
-
Rivet Starboard...
-
Connect Aileron...
-
Trim Bronze Linkage...
-
Trim Bronze Linkage...
-
Inspection ports and...
-
Aileron Linkage
-
Aileron Linkage
-
Starboard aileron hinge
-
Finish starboard...
-
Starboard Wingtip...
-
Inspection ports and...
-
Port Wing Tip Attach...
-
Sand Port Tip Edge
-
Drill Port Tip Attach
-
Port Side Tip Drill
-
Drill Tip Attach...
-
Port Acro Cap
-
Wing Tip, Bottom Attach
-
Aileron hinge,...
-
Receive Wing Quick...
-
Factory Quick Build
-
Quick Build Progress
-
Initial Purchase
-
Initial Purchase
Builder Name:
Pete Dailey
-
Project:
Sonex - Xenos-B Motorglider
-
VIEW REPORTS
Total Hours:
1506.3
Total Flight Time:
Total Expense:
$75148.03
Start/Last Date:
Jul 01, 2016 - No Finish Date
Engine:
Aerovee 2.1 Turbo
Propeller:
Sensenich
Panel:
MGL Avionics Explorer iEFIS/ECB/RDAC
Friendly URL:
https://eaabuilderslog.org?s=SpiritOfMudsuck
Home or Last Project Picture
Aug 21, 2021
Prep for primer
- (1.1 hours)
Category: Cockpit
Removed rudder pedals, throttle/mixture controls, through lines and fittings for brakes, spoiler pulleys and brackets. Vacuumed and wiped down forward cockpit with acetone.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.